T8 - Crossing Tracks
Requirements:
Both aircraft doing over 300kts
Both aircraft having any RNAV CAP besides Z
How to apply:
1. Use 15 min SRP to determine time from boundary
2. Drop ETOs/use estimates
What are the closing limits in D1-D4
Closing allowed except in D2 (both aircraft maintaining).
Closing Speed limit is no greather than 35 knots or M.06
How do you apply SE60