What are the key components in the process of setting up a new diagnostic assay as detailed by the ACCE framework?
Analytical validation, clinical validation, clinical utility and considerations of ethical, legal and social implications of the test.
What does the development stage of setting up a new test involve?
Assessment of both diagnostic and technical use of the process to ensure that the measurements obtained are relevant to the diagnostic question(s) and that the analyte(s) can be unambiguously identified (i.e. that there are no confounding factors).
The final stage is to determine whether the performance of the test, in terms of accuracy, meets the required diagnostic standards. This can be done by validation or verification depends on the existence of suitable performance specification that details the expected accuracy of the test
The result of the validation or verification determines whether and how the test will be implemented and set the requirements for performance monitoring (ongoing validation) of the test.
What must be considered when determining whether there is a clinical need for a service?
What must be considered when determining whether there is a clinical demand for a service?
What must be considered when determining the clinical utility of a service?
What should be considered when determining whether a test is legal/ethical?
What should be considered when setting up the technical process of a new test?
When implementing a new test what do you need to consider in relation to current practice?
What do you need to consider when determining whether a new test will replace a current test?
What budget considerations need to be made when implementing a new test?
What are the implications on staff when introducing a new test?
What equipment considerations should be made when implementing a new test?
What population factors should be consider when implementing a new test?
What background information is needed before development of a new test is carried out?
What is involved with the Validation of a new test?
Following development and validation/verification, what is needed to implement the service?