Construction Site Layout & Surveying:
Benchmark?
Backsight?
Foresight?
Equations relating each other?
Benchmark = permanent point of known elevation
Backsight = elevation difference using level rod to known point
Foresight = elevation difference using level rod of unknown point
TP = HI - FS
HI = BM + BS
OSHA/EPA requirements:
Permit required if how much land is disturbed?
What height of platform are railings required?
1 acre of disturbed land requires permit
platforms greater than 6 ft above ground require railing
mass diagram of earthwork axes
X axis = station
Y axis = cubic yards of excavation and embankment (cumulative sum of earthwork volumes)