1. When squaring up a large rectangular object, which method would be the least accurate? A. 12, 16, 20 method B. Carpenters square method C. Diagonal method D. Framing square method
2. A continuous load is load where the maximum current is expected to continue for how long? A. 120 minutes B. 180 minutes C. 150 minutes D. None of the above
4. What is a weekly report of supplies on hand called? A. LOGSTAT B. SITREP C. GOTWA D. WEEKLY REPORT
5. What is minimum length of splice plate? A. 16 Inches B. 24 inches C. 32 inches D. 18 inches
7. What are the three types of framing? A. Platform, balloon, board B. Wood, steal, platform C. Platform, braced, balloon D. Civilian, government, foreign
10. Which pipe/line exhausts sewer gases and provides the air pressure to allow waste to flow freely? A. Vent line B. Flow Line C. Drain Line D. Waste Line
12. If you have four to six 14 AWG wires in a conduit, what would be the allowable current-carrying capacity in percentage to the normal? A. 70% B. 80% C. 60% D. None of the above
13. Where is the cut line for a floor plan? A. 4’ above the floor B. 24” above the floor C. 8’ above the floor D. 6’ from the bottom of the floor
14. The project volume of concrete slab is 4290 cu ft. if the truck can only deliver 10 cu yds per truck, how many truck or trips required to finish project? A. 17 Trucks or trips B. 16 Trucks or trips C. 18 Trucks or trips D. None of the above
15. A gable roof of house having a span of 48 feet and length of 67 feet. The rafters are 2x8 paced in 16” O.C with 6/12 pitch and 16 inches overhang. Determine total rafter length. A. 26’ 9-5/16” B. 28’ 1-15/16” C. 26’ 9-15/16” D. 42’ 9-15/16” E. None of the above
18. \_\_\_\_\_\_\_\_ is medium thick line that indicate the alternate position of the parts A. Phantom Line B. Alternate Line C. Cut Line D. Extension Line
20. What are the pictorial drawings? A. Isometric, Oblique, section B. Oblique, Perspective, Tangent C. Perspective, Isometric, Oblique D. None of the above
21. What are the three categories of design life? A. Initial, Temporary, Permanent B. Semi-permanent, Temporary, Permanent C. Initial, long-term, short-term D. None of the above
23. How many trusses are needed to roof a hut that measures 8’x50’x125’ with a 24” overhang and 24” OC spacing? A. 64 B. 65 C. 67 D. 68
24. What acronym is used for helping administrations and HN training in Theater Operations? A. SWEAT-MSS B. ASCOPE C. METTT-C D. PMESII-PT
25. How lanes and gaps are set up around base camp? A. Staggered in a zigzag (serpentine) B. Box around base camp C. Straight line D. None of the above
27. What is most common used welding carbon steel? A. ER70S-6 B. ER60S-7 C. ER82S-1 D. .023ERS
Answer key