3 Advantages of AC motors over DC
Fundamental requirements for L system
Two reactor power states and MCP combos
2F/2F - Full Power
2S/2S - Half Power
Major types of Damage NSRP Suffers
Function of the MSC
Fulfil the requirement for no break supply when reactor fails or shutdown
Max power output for MG’s AC + DC
- 650Kw Ac
Function of the MG’s
Precautions before battery entry
Routines carried out 25 week cycle
Functions of DG
Alarms does the Teddington Series 6 have
Who controls the SS procedure and located ?
Duty engineer from Manoeuvring
Two lineups of the ESS busbar integrity
- Single MG/ MSC Standby
Functions of Switchgear
Steps to open close Breaker with faulty retaining coil
How is the 24v derived and split?
Name 5 panels in manoeuvring
What does IRMU monitor
Functions of EPM