What are the steam dump controls based on?
Which group(s) stagger open instead of opening all together?
Where are the arm/block solenoids powered from?
- VDAB (Train “B”)
How do the arm/block solenoids fail?
What are CRID 1 loads?
What are CRID 2 loads?
What are CRID 3 loads?
What are CRID 4 loads?
- Auctioneered High Tavg computer
What is Conditional C7A and is it an arming or blocking signal?
- 10% Step Load Change or 5% / min on MPC-254.
Allows operation of Group 1 and 2 Valves
What is Conditional C7B and is it an arming or blocking signal?
- 30% Step Load Change on MPC-254.
Allows operation of Group 3 Valves
What is Conditional C8 and is it an arming or blocking signal?
What is Conditional C9 and is it an arming or blocking signal?
What is Conditional P12 and is it an arming or blocking signal?
(3/4 Tave > 541°F - Status Light OFF)
What does the bypass interlock for P12 allow?
Bypass seals in until reset or P-12 block clears
Which ctrl switch will reset C7A and C7B conditionals and how are they reset?
Which steam dump groups are allowed to operate when the turbine trip controller is activated?
Which steam dump groups are allowed to operate when the load rejection controller is activated?
What is the design of the steam dumps?
What is the purpose of the steam dumps?
What is Tavg?
Thot + Tcold (rcs legs) divided by 2
What is high Auctioneered Tavg?
What signals does the turbine trip ctrlr use to open steam dumps?
What signals does the load rejection ctrlr use to open steam dumps?
What signal gives you Tref?