What is the RCDD’s role during installation?
Support, clarify design intent, answer RFIs, verify compliance.
What is the installer’s role?
Install according to drawings, standards, and manufacturer instructions.
What document guides installation?
Construction drawings + specifications.
What is considered a deviation from design?
Any change that alters pathways, materials, routing, or performance.
How must deviations be handled?
Through formal change control with documentation.
What happens if installed materials differ from spec?
Must be approved through submittal review or change request.
What is included in shop drawings?
Installer’s detailed drawings showing how they plan to build.
What are as-builts?
Updated drawings reflecting the installation as actually built.
Who verifies testing results for cable systems?
The RCDD or design authority.
What is a punch list?
List of incomplete or incorrect items to fix before final acceptance.
Who signs off on final acceptance?
Owner or authority identified in the contract.