Labour constant rate
Labour rate x labour constant rate
profile factor
corrugated iron
weatherboards
10 common trades
Plumbing & gasfitting Roofing Carpentry Joinery Metalwork Demolition Glazing Drainage Tiling Blockwork Brickwork Precast concrete Concrete works
how many decimal places
2dp = $35.00
SOQ
schedule of quantities
kiwisaver rate
2%
tool allowance
50 cents per hour
productive hours
Working hours 47.50 hours
insurances say
3%
holiday pay
16%
ACC Levies
3.5%
Clothing Allowance
50 cents per hour
Labour rate
weekly pay + all extras
Built up rate
labour rate build up/ productive hours
Two types of SOQ
elemental
Trade
CCWFEL
C= material cost C= cartage allowance W= wastage F= fixings E= minor equipment L= labour constant
cartage
+- 2.5%
SOQ are used for?
tendering purposes
what standard
ANZSMM 2018
Provisional sums
allowance usually estimated by the qs and included in the tender documents/SOQ.
Prime Cost Sums
monies allowed for u chosen items. adjusted one items are selected.
examples of pc sums
- tap fittings
- tiles
contingency
monies set aside for unforeseen works. only be spent under authorisation of client/architect/QS. sometimes inserted into SOQ.
Trade summary
Typically at the front of SOQ and is a summary of all trades price. Exclusive of GST.
tTypes of Contracts
RMBA contract