What is ‘value’?
Value is the ratio between benefit (outputs) & the cost of (inputs) required to achieve it
What is ‘Earned Value Management’?
What is a fundamental challenge of VM / VE?
The challenge is to understand the range of impacts that any particular decision may have, including their financial implications.
What is Value Engineering?
What is Value Management?
When should you carry out VM / VE?
How does VM / VE get distinguished?
In the UK, it is generally accepted that VM takes place
during the earlier stages of a project and that, once
designs and specifications have been developed, the same process becomes VE.
VM and VE should be used to guide and direct project
design and construction
What is the difference between VM / VE and scope omission?
What are the benefits of VM / VE to clients?
What are some similarities of a VM / VE study?
There are five well-established steps in a VM or VE study, as follows:
1) Understand the problem (workshops, desk study)
2) Identify different solutions (brainstorming, workshop)
3) Evaluate the different solutions (assess against value criteria, QS identifies costs)
4) Develop the shortlisted solutions in more detail (detailed costing by QS)
5) Identify the best solution and make recommendations (in the form of a report which documents the whole process)
What is the output from a VM / VE study?
What are the differences of VM / VE?
What is the link between VM / VE and risk management?
What is the link between VM / VE and whole life / life cycle costing?
What is lean construction? How does this link to VM / VE?
What is the link between VM / VE and BIM?
What resources are required to carry out a VM / VE study?
How did you report the outcomes of the VM / VE study?
Why should you issue a report for VM / VE?
*to provide assurance to the client that a robust and detailed analysis has been undertaken
What are some potential issues of carrying out VM / VE studies?
What is the role of a QS in VM / VE?
Name some stakeholders who could be involved in the process?
What if the project team does not have someone who can take on the VM / VE facilitator role?
In the absence of any other leads, suggestions
can be found on the website of the Institute of Value
Management (www.ivm.org.uk), or by searching online
for VM facilitators.
What are some facilitation techniques?