What is Work Breakdown Structure (WBS)?
Work Breakdown Structure (WBS) is a decomposition of the work into smaller or more detailed components. The WBS has multiple levels. The lowest level of the WBS is the detail cost account.
• The WBS decomposes the project into smaller components and more manageable units of work called work packages.
What is Work Package?