What is a work breakdown structure used
for?
What is a Work Breakdown Structure ?
6
what are the formats ?
Hireachy, Tabular List
Hireachy is:
Hierarchy: This format resembles an organizational chart, visually representing the project’s breakdown into major work items and their supporting sub-items. This structure makes it easy to see the relationships between different parts of the project and how they contribute to the overall goal.
Tabular is:
●
Tabular: This format presents the WBS in a table, with columns representing different levels of detail and rows listing the specific work items. This format can be helpful for larger projects with a significant number of work packages, allowing for clear organization and tracking of each element.
List is:
This format outlines the project breakdown as a sequential list, breaking down the project into increasingly detailed sub-items. It emphasizes a logical progression through the project, which can be helpful for planning and scheduling activities
WBS Contents include
Sources of Information for WBS:
○
Experienced planning and project engineers.
○
Professional cost estimators and programmers.
○
Senior construction and design engineers.
○
Documentation from similar past projects (conference papers, reports).
○
Organizational and industry guidelines (manuals, standards).
Starting a WBS:
○
Choose a format: Hierarchy, tabular, list.
○
Generic Headings: Consider common project elements like approvals, procurement, site establishment, underground services, foundations, structures, fit-out, testing, commissioning, and site cleanup.
○
Tailor Headings: Adjust for project type (civil, electrical/mechanical) and specific requirements.
○
Use Existing Data: Deconstruct previous critical path programs or cost estimates for similar projects to identify potential headings.
Evolution Through Project Stages:
Pre-feasibility and Feasibility: WBS helps define the project scope, enabling the assessment of time, cost, and economic viability.
○
Functional Design and Business Case: More detailed WBS supports decision-making on project continuation.
○
Delivery: WBS becomes critical for:
■
Detailed design and procurement.
■
Creating contract packages and identifying work packages for tenders.
■
Construction planning, scheduling, and risk assessment.
○
Completion: WBS facilitates:
■
Creation of as-built drawings.
■
Project reviews and identification of areas for improvement.