The stages of the process
Pre-contract stage - Seller
Pre-contract Stage - buyer
When is planning permission needed?
required for the carrying out of development (S 55 of the TCPA 1990
What is development of the property?
S 55 of the TCPA 1990:
The carrying out of building, engineering, mining or other operations in,on or over or under land.
The making of any material change in the use of any buildings or other land.
Material is not defined and is a question of fact and degree in each particular use.
Matters which do not constitute development
Works for maintenance, improvement or other alteration of a building which affect only the interior or do not materially affect the external appearance of a building
The use of buildings or land within the curtilage of a dwelling house for the purpose to the use of the dwelling house
Failure to comply with the building regulations
Prosecution for breach of building regulation control (£5,000 fine)
Proceedings must be brought within 2 years.
Enforcement notice requiring the alteration or removal of work carried out in breach of building regulations control (one year).
What to do as a buyer’s solicitor when building/planning consent not received?
Ask the seller to obtain a regularisation certificate from the local authority which will list the wok required to bring the building up to the correct standard. This is because the building might not be up to the correct standard.
Insurance.
There might result in issues with the lender who may be reluctant to lend or will impose conditions.
Planning permission - Seller’s solicitor checklist
Planning permission - Buyer’s solicitor checklist
The enquiries of the seller and local authority will provide valuable information.
Any irregularity should be corrected at the seller’s expense or an indemnity should be taken from the seller in the contract.
The buyer may ask the seller to obtain retrospective permission.
Instructions should be obtained from the buyer in respect of his plans for the property following acquisition to consider if planning will be needed.