The importance of rapid response in preparation for water damage restoration is…
…to minimize damage and reduce drying time - “critical action”
The technicians should have ability to communicate as a professional (what 3 things?)…
For a water damage restoration, the company should always show up with (what 3 things?)…
For the health and safety of the staff, what are the 3 immunizations to be addressed?
DO NOT begin work until a properly written contract (or authorization) is signed!!! What MUST the contract include?
WHO is responsible for payment and WHEN is it due!!!!
What are 3 important considerations in a job authorization/contract?
During INITIAL CONTACT, phone procedure (when practical) should include…
During INITIAL CONTACT, to provide true Emergency response, what two critical actions are needed when restoring a water-damaged structure to
reduce or retard microbial growth, even on Category 1 intrusion?
2. Dry structural materials rapidly
ANSI/IICRC S500 refers to…
The Standard of Care for the industry.
According to S500 1.2 (The Principles of Restoration), providing for the health and safety of workers and occupants are First & Foremost by doing what two things?
During the INITIAL INSPECTION, what are the 3 (three) most important work processes of the JOB SCOPE?
1) Evaluate and document ATMOSPHERIC CONDITIONS INSIDE/OUTSIDE and MOISTURE CONTENT OF MATERIALS in affected and unaffected areas (even if no water visible).
2) Evaluate and document IN WRITING/PICTURES:
a) SOURCE & TIME OF WATER INTRUSION including visible material deterioration
b) ANY VISIBLE MICROBIAL GROWTH (pre-existing damage)
c) bring PRE-EXISTING DAMAGE to attention of Materially Interested Parties (MIPs)
3) ESTABLISH DRYING GOALS
a) in agreement, if possible, with materially interested parties (MIPs)
b) then; determine dry standard:
(i) with reasonable approximation of conditions prior to intrusion or,
(ii) comparing to moisture content (MC) in unaffected areas of structure
The Frequency & Purpose of ONGOING INSPECTION should be…
- PURPOSE of monitoring: To document and adjust goals as needed
For FINAL INSPECTION (COMPLETION), what three factors are important to document and validate?
1) Determine and document pre-determined DRYING GOALS WERE MET
2) Drying EQUIPMENT SHOULD REMAIN in operation UNTIL drying goals have been MET
3) Two Documents should be INCLUDED - ATMOSPHERIC & EQUIPMENT READINGS; MC; surface temperatures:
a) Moisture Map (validates moisture content and location) and
b) Daily Humidity Record
The 3rd in Line of Principles is…
…to mitigate the intrusion “loss” (contain further damage)
Mitigating the Intrusion includes…
After cleaning/removing (properly disposing) unwanted materials and particulates…
What are the Four (4) Principles of Drying that should be considered on all drying projects?
(Clue: REDT)
R-E-D-T
After drying, completion of project is required by doing what? (2)