AP
Attach portion. You will be attaching a train to another
B
Berth.
Full shutdown of the train
CDR
Conductor.
A conductor will be working with you on that journey
DP
Detach point.
You will be detaching the train
DWFP
Detach and work front portion.
You will be detaching the train and driving the front part.
DWRP
Detach and work rear portion.
You will be detaching the train and driving the rear part.
DOO
Driver Only Operated.
You will be driving the train without OBS or a Conductor
LTP
Long Term Planning.
The schedule card will be from the original master diagram.
OBS
On Board Supervisor.
An OBS will be working on your train for that journey.
PASS
Passenger.
You will travel as a passenger
PA
Portion Attach.
Another train will be attaching to your train
PB
Prepare from Berth.
The train will be switched off completely. You will switch on and prepare the train for service.
PC
Prepare Circuit.
Key on, Follow schedule card instructions.
PD
Portion Detach.
Another driver will be detaching your train
PP
Partial Prep.
The train will already be switched on. You will prepare the train.
PNB
Physical Needs Break.
A minimum of 30min break will be implemented in your duty.
RA
Relieved At.
Another driver will be relieving you.
RW
Relieve and Work.
You will be relieving another driver.
STP
Short Term Planning
The schedule care will be altered from the original master diagram.
TC
Trip Circuit.
Key Off
WTT
Working Time Table
Detailed plan of railway movements.
DRA
Drivers
Reminder
Appliance
DBV
Drivers
Brake
Valve
DSD
Drivers
Safety
Device