ABN 2 Flashcards

(3 cards)

1
Q

ABN-803 Response to a Fire in the Control Room or Cable Spreading Room

What are the RO’s actions before leaving the Control Room per Attachment 1?

A

→trip Reactor and verify trip
→ensure Turbine is tripped
→trip TDAFW Pump
→isolate Main Steam lines
→close vent valves (8202A/B)
→isolate Letdown
→swap CCP suction to RWST
→place CCP 1-01 in Pull-Out
→stop RCPs
→place RHR Pumps in Pull-Out
→close RWST to RHR Pump suction valves (8812A/B)
→Go to RSP

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

ABN-803 Response to a Fire in the Control Room or Cable Spreading Room

What are the RO’s actions after leaving the Control Room in order to achieve Hot Shutdown per Attachment 1?

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

ABN-803 Response to a Fire in the Control Room or Cable Spreading Room

What are the Relief RO’s (BOP’s) actions to achieve Hot Shutdown per Attachment 2?

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly