If you violate a rule of the AIA code of ethics and professional conduct, it may be grounds for…
Disciplinary action by the Institute
What are the primary rules of the AIA code of ethics and professional conduct (4)?
What are the two types of corporations?
As a response to a “demand for arbitration”, you have three options:
There are three different arbitration procedure is. Describe them.
How long is the typical mediation session?
One day
What is a dispute review board? One pro and one con.
Similar to arbitration, but a pointed at the beginning of the project before any dispute arises.
Pro: the board is already familiar with the project and therefore decisions can be reached quickly.
Con: high cost associated with involving individuals from project outset.
Six additional services added to the contract at signing.
Six additional services usually added later.
What did the national Council of architectural registration boards first issue in 1977 as a set of model rules of contact?
NCARB model rules
Name seven types of compensation options
What is a negotiated select team?
When the contractor is selected early in the design process… Can accelerate portions of the building that are difficult to fabricator construct
What are the three rolls of a construction manager?
What is the project schedule and who prepares it?
Architect prepares it, establishing dates for completing design, contract documents, construction work.
Six pros and one con to the architect being CM
CON: increased liability and responsibility for job site safety
Is a bridged design build?
When an owner hires one architect for Plymouth area design and to establish performance specs. Then passed on to design-build team to complete technical drawings and construction.
Who was the first designer – builder?
Imhotep
What is “privately financed initiative” or “Build – operate – transfer”?
Consolidated teams of design, construction, development, and building operations delivering an operating completed buildings for extended periods up to 50 years… Leasing to the “owner”
Who is the father of architectural programming?
William Pena
What is NASF?
Net assignable square footage
What is GSF?
Gross Square footage
How many times more is project cost then construction cost?
1.3x
What is in the project documents?
The project manual and the project drawings
What is in the project manual?
Bidding requirements, contract forms and conditions, and specifications.