a. Steel portal frame with a brick and glazed elevation under a flat roof
a. Cracks in the brick work
b. Damage to the glazed elevation
c. Blocked gutters
d. Damp
e. Rust on metal work
f. Leaks
a. Turn off water but if not then ensure toilets regularly flushed
b. Electric on to feed fire and security systems
c. FRM checks monthly
d. Looks for fire hazards, evidence of rodents and leaks
e. Ensure service charge being billed to landlord
f. Council informed for business rates to Landlord
Asbestos and RAAC
a. Yes, whilst I have limited amount of experience in the procurement we do have a policy that ensures
i. Competent contractors that complete Savills pre-contract checks
ii. Value for money, scope of appointment, fee bid, analysis
iii. Appropriate insurance
iv. Comply with laws and H&S
a. No there wasn’t but I am aware that sum leases may include a sinking or reserve fund
a. Lease clause within the service charge schedule allows change to configuration of the property.
b. landlord was invested £5m to regenerate an area that uninviting and increase to increase trade and footfall.
a. The resurfacing costs are £300k but the breach in caps were £23k
a. The unexpired term certain for the retail park is 7.31 so it meant that the funding would be paid off before any vacancies occurred.
a. Because the plans was to increase parking spaces for tenants employees and easier access into the loading bay area which required removing the back of the unit.
This is for things like litter picking, sweeping of leaves, emptying bins, cleaning signage and general keeping clean and tidy.
a. 11.1% in October it has now fallen down to 6.7% (August 2023)
a. Title
b. Scale
c. North point
d. Redline
a. when a company becomes insolvent and is put under the control of Licensed Insolvency Practitioners.
a. Under an FRI lease the landlord has no repairing or insuring liability. IRI stands for an Internal Repairing Insuring lease where the tenant will have a narrower liability for maintenance, decorations, repairs and insurance confined to the internal parts of the property occupied by him/her.
a. £1.40-£150 p Sq Ft
a. I am not 100% sure as I have not done analysis into this. I am aware that our maintenance costs, since having this on board, has remained low and the resurfacing is the first major works we are doing. In addition to this, we do not need to invest as much into the marketing budget due to the park sitting right next to the main centre
a. No, at the moment the amount of the budget with unit 6 removed. The works for the three new units have now completed and once this is factored back in at the point of reconciliation then this will reduce it. In addition to this I did some analysis, projecting the increases for the next 6 years and once the forward funding for the roof works falls away in 2024 this will bring the £ per sq ft back to a normal level.
b. £10.90
c. It used to be a percentage of the SC budget but now it calculated by benchmarking, finding out what work is involved, how big the site is, looking at comparable schemes.
a. It is where the landlord will front the cost of, in this case, the resurfacing costs and then charge the cost back to the tenants over a number of years
a. No, not within these leases. But I am aware that, if the lease permits it, there is the possibility of using either a reserve fund or sinking fund. In this instance.
a. Sinking fund is where you money aside for planned expenditure
b. Where you put money aside for unexpected costs but this is really uncommon
a. Yes you can but only at the level the client is being charged