What is Cured in place pipe sewer lining technology?
• It is a way to rehabilitate underground pipelines without excavating by :
Insert and run a lining into a preexisting pipe that is subject to repair
You run an exposing uv light source in the pipe that cures the liner on the pipe and therefore the lining actas as a new pipeline.
What is the step-by-step process of the sewer lining?
How thick are the liner and the diameter of the pipes and length?
Why could the interface have been problematic?
What to include in an acceleration quote?
What is acceleration?
• Its when it’s decided to increase the rate that the works are completed to complete the works earlier than previously planned.
What does your contract say about acceleration?
How can acceleration be achieved?
In order to improve the rate of progress the contractor may be able to change:
• the site working hours
• the level of resources deployed
• the programme
• the temporary works; (increase scaffolding)
• the methods of working. (off site construction)
What is mitigation?
• Mitigation is when a contractor takes reasonable steps to minimize loss. It does not mean adding extra resources.
What is Total float and who owns it?
What is time risk allowance?
What is terminal float?
* This is also ‘owned’ by the Contractor and cannot be used to mitigate the effect of a compensation event.
What are the reasons for a programme not being accepted?
• Contractors plan shown are not practicable
• It does not show the information which this contract requires
• It does not represent the contractor’s plan realistically
• It does not comply with the works information
o Full scope not represented, or specific information omitted from the plan
How do get programme agreed?
How do you, create the ideal environment for success?
What does the programme include?
What is the Critical Path?