c. Whether it’s the cheapest solution (Correct)
a. operations. (Correct)
d. output, file and database, input, program, procedures, controls [Correct. See
Figure 22-2.]
b. debugging (Correct)
a. direct conversion (Correct)
b. 20 to 30 % (Correct)
d. Over the life of a system, only 30% of information systems work takes place during
development; the remaining 70% is spent maintaining the system.
8. Which of the following describes the systems testing approach that uses real transactions and files rather than hypothetical ones? a. walk-through b. processing of test transactions c. acceptance test d. parallel conversion test
c. acceptance test [Correct. An acceptance test uses real transaction data to test a new
system. ]
9. What is the process of discontinuing an old system as soon as a new one is introduced? a. direct conversion b. parallel conversion c. phase-in conversion d. pilot conversion
a. direct conversion [Correct. In direct conversion, the old system is discontinued as soon
as the new one is activated.]
10. Which of the following describes designing a program from the top-down to more detailed levels? a. hierarchical program design b. top-down program design c. parallel program design d. unstructured program design
a. hierarchical program design [Correct. Hierarchical program design is the process of
programming from the general level to the detailed level.]