What are the three concepts involved in total quality?
What conflict arises in total quality between defects and time/cost dimensions?
If all the focus is put on achieving a project end goal with zero defects, it can incur additional costs and take much longer. In addition, time and schedule management may be neglected. A balance needs to be established between the dimensions of time, cost and defect management
What is project quality management?
The management processes and techniques applied to lower the risk of product defects / system not meeting requirements
What three processes are involved in project quality management?
What is the purpose of quality planning?
In which areas of project management does quality planning occur?
What are the two activities that collectively form quality planning on project level?
What is quality assurance?
Assure that activities are performed up to the standard or quality set out in the PQMP
What are the two levels at which quality assurance is carried out?
- Making sure that there is continuous improvement of the current project, for future projects
What is quality control?
Ensuring that the quality assurance activities are performed and that all requirements are met. Includes planned quality control and ad hoc problem solving
Name three quality assurance techniques
Describe two quality control techniques