✅ Answer: A – Basic ingredients of concrete.
Binding paste + aggregates = solid mass.
✅ Answer: D – All depend on w/c ratio.
Lower w/c → higher strength but less workable.
✅ Answer: B – Between 0.4–0.6 for most design mixes.*
✅ Answer: A – Per ASTM C39 / NSCP 702.*
✅ Answer: D – 28 days = f′c basis.*
✅ Answer: A – f′c = P/A of specimen.*
✅ Answer: B – ACI formula for flexural strength.*
✅ Answer: A – Ease of placement.*
✅ Answer: B – 300 mm high, 100–200 mm base top.*
✅ Answer: B – Medium workability for RCC.*
✅ Answer: A – 4.75 mm ( No. 4 sieve ).*
✅ Answer: A – Indicates coarseness.*
✅ Answer: A – Thin water film causes apparent volume increase.*
✅ Answer: A – Resistance to impact load.*
✅ Answer: A – Aggregate abrasion resistance.*
✅ Answer: C – Typical for OPC.*
✅ Answer: B – Per ASTM C191 / PNS 07.*
✅ Answer: B – Within 4 hours max.*
✅ Answer: A – Expansion test to prevent cracking.*
✅ Answer: A – Normal rock aggregate range.*
✅ Answer: A – Per ASTM A615 bar specs.*
✅ Answer: C – ≈ 420 MPa ( 60 ksi ).*
✅ Answer: A – Surface hardness → approx strength.*
✅ Answer: A – Detects voids & cracks.*