Name some advantages and disadvantages of precast concrete
Name some advantages and disadvantages of insitu concrete
What are the RIBA stages of work?
0 - Strategic Detention
1- Preparation and briefing
2 - Concept design
3 - Spatial coordination
4 - Technical design
5 - Manufacturing and construction
6 - Handover
7 - Use
What are the GRIP stages?
1 - Output definition
2 - Feasibility
3 - Option Selection
4 - Single Option Development
5 - Detailed Design
6 - Construction test and commission
7 - Scheme handback
8 - Project Close out
What takes place in RIBA stage 0?
What takes place in RIBA stage 1?
What takes place in RIBA stage 2?
What takes place in RIBA stage 3?
What takes place in RIBA stage 4?
What takes place in RIBA stage 5?
What takes place in RIBA stage 6?
What takes place in RIBA stage 7?
What are the benefits of BIM?
Name some different types of piles
What is a CAT3 check?
What is a CAT2 check?
What is a CAT1 check?
When is BIM applicable for a construction project?
What is a latent defect?
Can you explain how you managed the Thames Water Sewer with the asset owner?
When would you appoint a Contractor under the RIBA stages of work?
Depends of the procurement route
- Traditional procurement: Stage 4
- Design & Build procurement: Stage 3
- Management contract/Construction management: Stage 2
What are contiguous piles?
They are piles which are bored with a close proximity of each other to allow ground retaining functions, as well as lateral load functions