Planning and monitoring of time requires:
5 Principal Attributes and Importance.
1.) Cost 2,) Performance 3.) Safety 4.) Reliability 5.) Appearance
Analysis of attributes and establishment of priority ratings is essential for effective decision making and good design.
4 Main aspects of Problem solving
Name the five main resources available for manufacturing.
What 2 things must be taken into account I.e.Solution parameters
2. )Budgetary constraints
Problem definition
Primary consideration in defining a problem is brevity.
Ensure to not over complicate by confining descriptions to few words.
Most consider secondary functions
What are 6 questions to consider to determine what a product is needed for?
What does problem identification require?
Identify this two stages of device design?
2. ) problem solving.
Define Engineering Design?
The Recognition and understanding of a basic need and the creation of a system to satisfy that need.