With what frequency is it expected that events will occur that require entering EOP series procedures
When is foldout page guidance applicable
What conditions requiring using adverse containment criteria
When can you quit using adverse containment values
For EOP steps with multiple substeps, in which order can the substeps be performed
If a contingency action cannot be performed what is the crew supposed to do
What is the order of priority for Critical Safety Functions
When is continuous monitoring of a Critical Safety Function required
At what periodicity are Yellow (Not Satisfied) and Green (Satisfied) Critical Safety Functions required to be monitored
Given an ORANGE Subcriticality path and a RED Heat Sink path, which FRP would be entered first and why?
- RED before ORANGE, Highest to Lowest Priority
What are the fission product barriers
As RCS pressure lowers, what happens to break flow
How does a lowering Tave affect break flow from density effect
How does a lowering Tave affect break flow from the Choke Flow effect
What are the methods of heat removal available on the Primary (RCS) side
- Break Flow
What are the methods of heat removal available on the Secondary (SG) side
- Steam Generators
What are the effects of “Uncovering the Break”
Where is the worst location to have a SBLOCA and why
- It requires more mass to be lost before the break is uncovered because the cross under loop seal must be cleared
What indications are consistent with a Faulted Steam Generator (E-2)
What indications are consistent with a Ruptured Steam Generator (E-3)
What indications are consistent with a LOCA (E-1)
What are the SI termination criteria
What are the EOP RCP trip Fold Out Page criteria
- RCS pressure less than 1300 # AND 1 CCP or SI pp running
What are the AFW switchover Fold Out Page criteria