What are the SI termination criteria given in ES-1.1 (SI Termination)
While in E-1 (Loss of Reactor or Secondary Coolant) what actions are taken if the SG pressure boundary IS NOT intact
While in E-1 (Loss of Reactor or Secondary Coolant) what actions are taken if the SG levels are NOT intact
While in E-1 (Loss of Reactor or Secondary Coolant) what actions are taken if subcooling, heat sink, RCS pressure, and Pzr Level are satisfactory
In E-1 (Loss of Reactor or Secondary Coolant) what is the purpose of the procedure loop that has you check:
AND what would the consequence be if you proceeded on with either condition NOT MET (i.e., instead of going to the RNO)
While in E-1 (Loss of Reactor or Secondary Coolant) what actions are taken if Cold Leg Recirc capability is unavailable
In E-1 (Loss of Reactor or Secondary Coolant) what actions are taken if there is an Aux Building LOCA
In E-1 (Loss of Reactor or Secondary Coolant) what actions are taken if RCS pressure is greater than the shutoff head of the RHR pumps (300#)
In E-1 (Loss of Reactor or Secondary Coolant) what actions are taken if RWST level is less than 30%
In E-1 (Loss of Reactor or Secondary Coolant) what actions are taken at 7 hours after the event
In ES-1.2 (Post LOCA Cooldown and Depressurization) what actions are taken if Cold Leg Recirc capability is unavailable
In ES-1.2 (Post LOCA Cooldown and Depressurization) what actions are taken if there is an Aux Building LOCA
While in ES-1.2 (Post LOCA Cooldown and Depressurization) what actions are taken if the SG levels are NOT intact
In ES-1.2 (Post LOCA Cooldown and Depressurization) after the cooldown is started and subcooling is verified greater than 40 deg F what actions is taken if ECCS is in service
In ES-1.2 (Post LOCA Cooldown and Depressurization) ANY time after SI has been reset AND ECCS pumps have been removed what actions are required if subcooling is lost OR Pzr Level is less than 20% [24% ADVERSE]
In FR-Z.1 (Response to High Containment Pressure) if ECA-1.1 (Loss of Emergency Coolant Recirc) is in effect what actions are required
When do you enter FR-Z.1 (Response to High Containment Pressure)
While in E-1 (Loss of Reactor or Secondary Coolant) after transfer to Cold Leg Recirc is complete, what conditions would require a transition to ECA-1.3 (Sump Blockage)
- Indications of cavitation on any RHR/CTS pump
What are the four phases of a LBLOCA
What are the three phases of a SBLOCA
During a SBLOCA why is a Cold Leg Break the worst location for a break
In ES-1.2 (Post LOCA Cooldown and Depressurization) why is more subcooling required when there are NO RCPs running
Why are RCPs stopped when RCS pressure is less than 1300#
What are the time critical actions during ES-1.3 (Transfer to Cold Leg Recirc)