State the ECCS Design Criteria
HOTCC is pnemonic.
State the SDC system design criteria.
State the CS Design criteria
What are the setpoints for SIAS?
CSAS?
With regard to SI system, what occurs on these signals?
Why do we have to have a minimum RWT volume?
Which HPSI pump would you use to fill the SITs?
What would happen to SIT level if the HPSI pump is secured before closing the throttle fill valve?
B train HPSI pump.
SIT will drain to the RWT.
What is the rated flow of the HPSI pumps?
What is the HPSI pump shutoff head?
What is the minimum indicated HPSI flow?
Each HPSI pump has a normally open discharge valve. Downstream of this there are 4 RCS loop isolations. How are these isolations repositioned for injection?
A. They are normally open valves and do not require repositioning.
B. They are MOVs that are opened by the operator once HPSI flow has been established.
C. They are MOVs that are opened on a SIAS signal to provide injection flow path.
D. They are interlocked with the HPSI recirc miniflow valves and will open once the miniflow is closed.
C. These valves are MOVs that are opened on a SIAS signal to provide injection flow without operator action.
How long can the HPSI pump run at minimum flow?
At what GPM flow can the HPSI pump run unlimited?
State the rated flow and shutoff head for the LPSI pumps.
How long can the LPSI pump run at 100 GPM?
At 2400 GPM?
what flow range should be minimized and why?
1 hour
Unlimited run time
2500-3500 gpm.
State the Rated flow and shutoff head for the CS pumps.
What flow rate requires the CS pump run time to be limited to 1 hour?
What flow rate allows unlimited run time?
what is the rumble region of the CS pumps?
150 gpm
2100 gpm
1800-2800 gpm
What must be done on an inadvertent CSAS signal(no SIAS) to gain control and stop the running SI pumps?
How are the SIT outlet valves ensured to be open at normal operating conditions?
State the TS limits for the SITs.
SDC should be removed from service above what temperature?
Why?
What temperature must be met to run SDC for more than 4 days?
> 260F
to preclude ECCS steam void formation and SDC gas binding.
<135F
What RCS pressure and temperature limits prevent CS pump alignment to supply SDC?
What is the SDC HX max warmup rate?
19F/minute.
Why must SDC warmup line flow get subtracted from LPSI loop flow transmitter?
because this flow is not entering the RCS and must be removed from RCS total flow.
How is purification flow throttled when SDC is aligned the the CVCS system?
What pressure is the LTOP relief set to?
Where does it relieve to?
What is a good first clue that a relief has lifted?
467 psia
relieve to the containment sumps.
Containment sump temperatures will go up.
When can SDC suction valves be opened?
If this pressure is exceeded will the SDC suction valves auto close?
How is the SDC low flow alarm configured and is there a risk of not being alerted to a loss of SDC flow?
The alarm logic has breaker inputs and will not alarm if the breaker trips open. This can go unnoticed if a SEIS alarm is already in and result in a silent loss of SDC.