1
Q

How many phases and milestone decisions does the Defense Acquisition System have?

A

Five phases and three milestone decisions.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What is the entry point into the acquisition process for all defense acquisition products?

A

Materiel Development Decision (MDD).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Which Major Capability Acquisition phase is the earliest phase where competitive prototyping would take place?

A

Technology Maturation and Risk Reduction (TMRR).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What is the objective of the Operations and Sustainment phase?

A

Sustain the system’s performance and readiness at the lowest total life-cycle cost.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Which authority allows the Department of Defense (DoD) to utilize up to $200M to address an urgent need?

A

Rapid Acquisition Authority (RAA).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Who is responsible for balancing cost, schedule, and performance?

A

Project, Program, or Product Managers (PMs).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

The characteristics a materiel solution must meet are known as what?

A

Key Performance Parameters (KPPs).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What determines the level of review and who will make the milestone decisions?

A

Acquisition Category (ACAT) designation.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Generally developed by branch proponents, what package formally recommends a new or modified organizational structure?

A

Force Design Update (FDU).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

The Table of Organization and Equipment (TOE) and Basis of Issue Plan (BOIP) are finalized and documented by which organization?

A

United States Army Force Management Support Agency (USAFMSA).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Which document lists the planned placement of quantities of equipment and associated support items as well as the reciprocal displacement of equipment and personnel?

A

Basis of Issue Plan (BOIP).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Part of the Force Design Update (FDU), which document contains: (1) narrative and unit mission/capabilities; (2) existing and proposed organizational structure/hierarchy; (3) key personnel and equipment with a bill‑paying strategy; (4) graphical depiction of the proposed design?

A

Unit Reference Sheet (URS).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

To determine if the impacts of a proposed change are suitable, feasible, and acceptable to the Total Army, Headquarters, Department of the Army (HQDA) conducts what analysis?

A

Force Integration Functional Area (FIFA) analysis.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

A Table of Organization and Equipment (TOE) prescribes the doctrinal wartime mission, organizational structure, and the personnel and equipment __________ for a military unit.

A

Requirements.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Which step in the Force Design Update (FDU) process ensures all impacted Centers of Excellence can address second‑ and third‑order effects of an organizational change?

A

Worldwide staffing.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What is Phase 1 of the Defense Acquisition System?

A

Materiel Solution Analysis (MSA).

17
Q

What is Phase 2 of the Defense Acquisition System?

A

Technology Maturation and Risk Reduction (TMRR).

18
Q

What is Phase 3 of the Defense Acquisition System?

A

Engineering and Manufacturing Development (EMD).

19
Q

What is Phase 4 of the Defense Acquisition System?

A

Production and Deployment (P&D).

20
Q

What is Phase 5 of the Defense Acquisition System?

A

Operations and Support (O&S).

21
Q

What is Milestone A in the Defense Acquisition System?

A

Decision to enter Technology Maturation and Risk Reduction (TMRR).

22
Q

What is Milestone B in the Defense Acquisition System?

A

Decision to enter Engineering and Manufacturing Development (EMD).

23
Q

What is Milestone C in the Defense Acquisition System?

A

Decision to enter Production and Deployment (P&D).