Before Push Flow
Hydraulics-ON Doors-CLOSED Transponder- Set to Transponder ON Anti-Collision-ON Sterile Light-ON
Establishing Power and A/C Pre-Check:
Establishing Ground Power:
GRD Power Available Light: ILLUMINATED
GRD Power switch: ON (Verify TRANSFER BUS OFF and SOURCE OFF lights have extinguished)
Establishing APU Power:
(NOTE: The WHEEL WELL fire warning light may or may not illuminate when testing on DC power only, Do the WHEEL WELL fire detect test once AC Power is established.)
After Start Flow
Probe Heat Anti-Ice Trim Air Air Cond. and Pressurization APU Switch
Recall Panel
Auto Brakes
Audio Panel
After Landing Flow
Speed brakes: DOWN/CLOSED Flaps: UP Stab Trim: SET Auto Brake: OFF Wx Radar: OFF Flight Directors: OFF Ext. Lights: As Required ENG Start Switches:As Required Anti-Ice: OFF Probe Heat: OFF Trim Air: OFF
——HEAVY HAND FALLS—–
Transponder: XPNDR
Radar: TEST
After-TakeOff Flow
Flaps UP + Lights OUT
Landing Gear OFF + Lights OUT
Auto-Brakes OFF
Engine Start Switches. As Req.
Bleeds and Packs ON and AUTO
APU Switch OFF (As Req.)