What is the typical high-level process for an inspection? (4)
What to take on an inspection? (5+)
What should you consider when ‘inspecting the local area’? (3)
What should be considered on the external inspection? (5)
How do you date a building? (5)
What should be considered for an internal inspection? (7)
What are the different purposes of an inspection? (3)
What are the four types of foundations? (4)
When is the trench/strip foundation generally used?
Explain raft foundation
Explain piled foundation
Explain pad foundation
Typical foundation used for an industrial unit?
Pad foundation
Typical foundation used for offices?
Pile foundation
Typical foundation used for small shops or houses?
Strip foundation
What is solid wall construction?
What is cavity wall construction? (2)
Difference between a stretcher and a header? (2)
What is efflorescence? (2)
What is spalling?
What is the institutional specifications for a shop? (5)
What are the two main methods of construction for an office? (2)
What is the difference between steel and concrete framed? (2)
Where do you find the current institutional specifications for offices and what are some of them? (1+7)
British Council for Offices Guide to Office Specification, 2023
- Approximate ceiling height of 2.6-2.8m
- Air-conditioned
- Double-glazed windows
- Passenger lifts
- 1 cycle space per 10 staff
- 1 shower per 100 staff
- 8sqm to 10sqm general workplace density