What do all the org project enabling processes take as an input?
All the organizational project-enabling processes take the organization strategic plan as an input
What is something important that LCMM’s activities include that you might forget?
Actually establishing a LCMM process
What are inputs and outputs for LCMM you might forget?
It gets a couple inputs from QM and the organization tailoring strategy from TLR. Its outputs go to MEAS (org process performance measures needs/data), and to Control (basically OPAs)
What inputs and outputs for INFRAM are ones you’d forget?
IFRAM gets infrastructure needs from both PM and PP. Its outputs (org. infrastructure and project infrastructure) to the organization and the project(s) are enablers to both.
What inputs and outputs of PM might you miss?
PM gets supply strategy from SUP (note there is no similar input from ACQ). It also gets project status reports from PAC. Distinct outputs are project direction to PP and PAC, org lessons learned to KM, project portfolio to PP/HRM.
What I/Os of KM might you miss?
KM has pretty predictable inputs and outputs. Key inputs are both org lessons learned from PM and project lessons learned from PAC; the key output is the KM system which is then an enabler.
What Tailoring IPOs might I miss?
Tailoring primarily takes the life cycle models from LCMM, and outputs both org and project tailoring strategies (LCMM and PP). The activity I’m most likely to forget is “Take due account of the life cycle structures recommended or mandated by standards.”
What ACQ actvities might I miss?
What ACQ I/Os might I miss?
What SUP activities might I miss?
What SUP inputs might I miss?
Which SUP outputs might I miss?
What is a RM activity I may miss?
Manage the Risk Profile
What is it from all the the other life cycle processes that could be inputs into CM?
CIs generated by any other life cycle process
Where do major, specific outputs of the TM processes almost always go?
PAC
What might I miss about QA’s inputs?
None of them come from the technical processes, not even from verification or validation.
Where do CRs from PAC go?
Into CM and INFOM
What about life cycle concepts/constraints could I miss?
How does the RVTM trace through the life cycle?
Trace MOEs/MOPs/TPMs through the life cycle
What are source documents?
Source documents are external documents relevant to the particular stage of procurement activity for the system of interest. Inputs into PP, BMA, and SNRD.
What’s the trace for Project Constraints through the life cycle?
Project Constraints get generated by Project Planning, but are only inputs into BMA and SNRD
How do the various traceabiities (e.g. design traceability, implementation traceability) evolve through the V?
In the left side and bottom of the V, traceabilities are bi-directional and generally from/to before/after. E.g. for IMPL: Design traceability (from the predecessor process) is an input to IMPL. Implementation traceability flow both back to DD and forward to INT.
What is a key input from ACQ to INT?
Accepted system