Per 40AC-9ZZ06, Locked Valve Control, when is an IV required?
When Locking and Sealing VALVES, BREAKERS and COMPONENTS as follows:
How often are AUDITS required for Locked Valve/Breaker/Component Alignment Lists?
At least ONCE during every refueling outage
*Seals don’t need to be removed for the checks unless CRS/SM directed
If an existing tag references a SHIFT SUPERVISOR (previous terminology) when is required?
NOTHING needs to be relabeled as this is defined as Equivalent Terminology for SM
For Valves, how do we attach a Tag?
With WIRE CABLE and a SEALING DEVICE should be attached to the cable to prevent Manual Operation
40AC-9ZZ06 ensures a method is established to require ADMIN CONTROLS for locking what 3 items?
Who can authorize re-position of a valve, breaker or component?
CRS/SM
How is a Locked Valve, Breaker or Component Identified (Sample Tag Info)?
Controlled by 40AC-0ZZ06
DO NOT OPERATE WITHOUT APPROVAL OF SM
Describe the BASIC STEPS to manipulate a component from the LOCKED condition:
What LIMITS are imposed when relying on an individual to Close a CIV?
Has to be able to respond to close valve in 60 seconds
Where can we find a Manual Component Listing for “Locked closed manual CIV’s which can be opened Intermittently”?
TRM T7.0.300
For CIV Admin Controls, what are the required COMMUNICATIONS to be established?
2. The CR
Who maintains the “Locked Valve, Breaker, and Component Record Book”?
SM/CRS