What is MARPOL?
Developed by the IMO and is aimed at preventing and minimizing pollution from ships - both accidental and from routine operations.
Created in response to a number on tanker accidents in the late 1970s - namely Torrey Canyon accident.
What are the 6 Annexes of MARPOL
“Oh No Here She Goes Again!”
Annex I : Petroleum Oil
Annex II: Noxious Liquid Substances in Bulk
Annex III: Harmful Substances carried by sea in packaged form (Packaged Chemicals)
Annex IV: Sewage
Annex V: Garbage
Annex VI: Prevention of Air Pollution from Ships
MARPOL - Annex 1 - Oil -
Who does it apply to?
What certificate is issued and how long does it last?
What other documentation is required?
MARPOL - What are the contents and requirements for the oil record book?
BCCB
ORB part 1
ORB part 2 is for cargo/ballast operations on oil tankers
Kept onboard for 3 years after last entry
- After an entry, the OIC must sign and the next entry goes on the next free line. Do not leave spare lines
- Master to sign the bottom of each page
H26 - Code for bunkering of fuel or lubricating oil
What are the rules concerned with discharge of oily water?
Outside special areas
Inside special areas
1. Same as above but in addition the oil filtering equipment must have an automatic shut off
MARPOL - What equipment is required within SOPEP under ANNEX I ?
Contact Details for SOPEP
Purpose of SOPEP?
Contains:
-Reporting requirements
-Steps to control discharge
-National and Local Coordination
-Coastal, Port and Ship interest contacts
-Ships drawing
-GA plan
-Tank plan
Special Areas concerned with Annex 1 (Oil) of MARPOL
Seas:
Bunkering Safety Checklist
-Bunkering hoses in good condition
-Bunkering connections connected correctly and drip trays in place
-Communication system agreed
-Appropriately qualified person manning all crucial areas (dock, fuelling manifold, ECR)
-Exterior doors closed
-Scupper and freeing ports blocked
-Vessel securely moored
-Transfer hose appropriately secured
-FFE and PPE in place
-Appropriate signal flag in place
As master:
-Risk assessment been carried out
-Weather checked
-SMS Procedures followed
-Maximum pumping rate and pressure agreed with supplier
-Soundings taken frequently
-Rate of delivery is slowed down while topping off
-Oil record book (H26), deck, engine logbooks are completed
MARPOL ANNEX 4 “SEWAGE”
Who does it apply to?
What certificate is issued and how long does it last?
What three types of sewage treatment are there and when can they be discharged?
What are the special areas concerning sewage?
MARPOL - Annex 5 - Garbage
Who does it apply to?
What certificate is issued and how long does it last?
What other documentation is required?
No certification…. BUT
- All vessels >100 GT or 15 persons or more require Garbage management plan: I.C (Normally Chief Officer)
+ Collection
+ Segregation
+ Storage
+ Disposal
- All vessels over 100 GT to have a garbage record book
-Details all discharges, their location, category of garbage, quantity discharged and signature - keep reciept if discharged at shore facility and retain as proof. Master to sign bottom of all pages.
-GRB kept for 2 years after last entry is made
- Any vessel over 12m needs to display a garbage placard
Categories:
A- Plastics
B - Food Waste
C - Domestic
D - Cooking Oil
I - E-waste
(Operational Waste, Animal Carcasses, Incinerator Ash)
Food Waste comminuted and ground (not greater than 25mm) can be disposed >3NM outside special area, >12NM inside special area
Food waste Not comminuted and ground >12NM outside special area and not permitted in Special area.
Cargo residues/Wash water allowed >12NM outside special area and permitted within Special area >12NM only under specific requirements such as when contained in wash water and not harmful to marine environment.
What are the special areas concerned with disposal of garbage?
MARPOL - Annex 6 - Air Pollution
Who does it apply to?
What certificate is issued and how long does it last?
What other documentation is required?
What are the Max Sulphur contents?
Engine tiers - related to construction dates and engine RPM
1 - 2000 - earlier
2 - 2011 - earlier
3 - 2016 - earlier
Different NoX requirements for different tiers.
Fuel samples need to be held for 12 months
Bunker delivery notes kept to prove Sulphur content
SEEMP - A continual Plan - Implement - Monitor - Evaluate/Improve process
Annex V - Discharge Provisions