ASTM E 1527
Phase I ESA
ASTM E 1903
Phase II ESA
ASHRAE 55
Thermal Comfort
-Keeps energy modeler honest
ASHRAE 62
Ventilation & Indoor Air Quality
-How fresh “fresh air” must be
ASHRAE 90.1
Energy & Lighting
Gross-up Factor
Rentable / Usable
Can loam support a building?
Yes
What is included in Phase I ESA?
-Site Inspection
-Historical Records Review
-Interviews
What is included in Phase II ESA?
-Soil Testing
-Ground Water sample test
-Building Material testing
What is bank soil measure?
Earth in its natural state.
What is Loose measure?
Earth in transport.
What is Compacted measure?
Loose soil once compacted.
Compacted Soil =
(100% (+ Swell or - Shrink)) x Bank cy
Why are trenches a good option for geothermal in a rural area?
Land is available! costs $ to excavate.
What is form based local building codes?
Shift the emphasis from regulating building use to urban form. Encourages walkability.
What is the road hierarchy from smallest to largest?
-Local
-Collector
-Arterial
-Expressway
When is rough order of magnitude used and how accurate?
Early stages, +/- 50%
Can you build in a riparian zone?
No
What is the most efficient parking lot layout?
One way, angled 75 degrees.
Min. width of a two-way, 90-degree parking lot:
59’
Min. width of a two-way, 60-degree parking lot:
57’
Min. width of a one-way, 45-degree parking lot:
49’
Min. width of a two-way, 30-degree parking lot:
46’
Vertical cracks in foundation:
Not a serious problem. Due to Shrinkage.