what is reduced construction time
factory production runs parallel to site preparation
what is improved quality control
controlled environment allows for precise manufacturing
less waste
efficient use of materials and recycling in factory settings
reduced site distribution
fewer deliveries and shorter on site construction periods
improved health and safety
controlled factory requirement reduces risks
weather independance
production can continue regardless of outdoor conditions
what are timber frame panels
they are the most common in uk residential construction
what are steel frame panels
they have a higher strength to waist ratio than timber.
what are hybrid panels
they are a combination of timber and steel
what is frame assembly
cutting and joining of frame members
insulation installation
fitting of insulation materials within the frame
sheathing application
attachment of boards to one or both sides
what is service integration
pre installation of electrical and plumbing services
what is finishing
application of vapour barriers, external cladding or internal linings
what is face preparation
metal coils are unrolled, cleaned and treated.
what is profiling
faces are shaped to the required profile
what is core preparation
insulation material is mixed or cut to size
what is curing
panels are held in presses until the core or adhesive is fully cured
what is cutting
panels are cut to the required length
what is edge treatment
panel edges are finished as required
what is quality control
panels are checked for dimensional accuracy, bond strength and thermal performance
what is panel placement
panels are lifted into position using cranes or vacuum lifters.
what is fixing to structure
panels are secured to the building structure using concealed or through fixings
what is joint sealing
joints between panels are sealed using gaskets, sealants or cover strips