Pickering Flashcards

(5 cards)

1
Q

what are some soft enginerring strategies in PIckering?

A

over 300 leaky dams have been created
planted 40,000 trees
river channell restoration
farmland close to the water is used to store water during flood times

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

what are some hard engineering strategies?

A

creation of a small dam to control the release of flood water
low level embankments built in floodplains to store water
over 200 moorland channels blocked in the upper catchment

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

what is the river in Pickering?

A

the pickering beck

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

how much did the last flood cost?

A

7 million

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

what main road runs through Pickering?

A

A169

How well did you know this?
1
Not at all
2
3
4
5
Perfectly