The contract documents consists of …
…the Owner-Contractor Agreements, the general conditions of the contract, the supplementary conditions of the contract (if any), the drawings, specifications, and addenda issued propr to execution of the contract, and other documents specifically listed in the agreements, and modifications issued after execution of the contract
Modification (change order)
a construction change directive
-a written order issued by the architect for a minor change in the work, or a written amendment to the contract signed by both parties
project delivery
-entire sequence of events necessary to provide an owner with a completed building
the legal concept of agency involves three parties:
1) the principal (owner)
2) the agent (architect)
3) third party (contractor)
single prime contract
-contract in which the owner has an agreement with a general contractor to build a project according to the plans and specs
primary advantage of a single prime contract
multiple prime contract
many prime contracts
design-award-build method
advantages of design-award-build method
disadvantages of design-award-build method
-one phase of the project must be completed before the next phase can begin
fast track method
-used when overall time for design and construction must be compressed
roles of a construction manager (CM)
what contractual document is used if a CM is an independent advisor?
What are the advantages of using a CM
What are the disadvantages of using a CM
What are the disdvantages if a CM acts as the construction contractor?
three common methods for establishing a total cost for the project
fixed price method (stupulated sum or lump sum)
guaranteed max price method
cost plus fee method
design build method
-owner contracts with one entity to provide both design and construction services
advantages of design build method
disadvantages of design build method