What is the Fault Response Procedure?
What must be included in a Fault Report?
What is Heat Patrol?
Why, when and where is this done?
Duting extreme heat of 38°C or higher, a CJCT views the track from the forward travelling DTC to inspect track for misalligned track due to heat buckling.
Buckles only occur on Ballast Track, meaning heat patrol is only required betwen CHW & NTR, & BLV & CUD.
Reporting any affected track allows the TC to implement a 20kph speed restriction in afected areas.
What is the purpose of the Line Check Clear Procedure?
(Detailed procedure steps asked on another card)
Following a period on engineering work that exceeds 4 consequative hours, this procedure utilises one assurance train service of each day on both up & down line to verify the availability and functionality of Rolling Stock, Wayside and ATS systems.
How is the Line Check Clear Procedure carried out?
What is the Train Sweep Procedure?
What steps are required to complete a train Sweep?
When terminating trainsets. Train Sweep ensures no customers or lost property remains onboard before the train is sent to the yard for stabling or maintenance.
What is the Base Staff required to Conduct a Train Sweep?
What is the secondary requirement?
Base: A CJCT to enter train and conduct sweep.
Secondary: A CJCS to remain on the platform to ensure no customers attempt to enter the train.
What does a Key Switch do?
What are types of key switches?
Removing a key switch from its receptacle prevents all UTO & PM operated train movements for the individual track or zone to be protected by the removal of the associated key.
NOTE: Removal of key switches will not protect workers from RM mode and other manually operated rail traffic movements.
SPKS - Staff Protection Key Switch
ZIKS - Zone Isolation Key Switch
CSKS - Co-Oporative Siding Key Switch
Where are the Epping Siding CSKS located?
Within wall-mounted boxes, one on each siding (Up Siding and Down Siding) at country end.
When activating the CSKS at Epping Siding (turning to ZONE PROTECTED and removing key) what colour will the light illuminate to indicate UTO and PM operated rail traffic is not autherised to move in the zone?
Green
Where are SPKS located?
What do they protect?
Maintenance Building / Depot
Protecting different areas within the maintence areas from UTO and PM controlled rail traffic.
Where are the ZIKS located?
What do they protect?
Maintenance Building
Protecting 8 pre-defined zones accross the yard to remove movement authority to UTO and PM controlled rail traffic.
What needs to be reported immediately?
Graffiti
Structural Defects
Spills
Trip Hazards