PU Practice test incorrect answers Flashcards

(33 cards)

1
Q

Minimum required depth of filtration media in gravity water filters?

A

24 inches

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Surface-derived public water supplies shall originate from what type of area?

A

Uninhabited wooded areas

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Minimum distance wells must be located from sanitary sewer?

A

100 feet

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Minimum cover depth required for water mains?

A

2.5 feet

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What makes a construction contract binding?

A

Offer
Acceptance
Consideration
Legal purpose
(All must be present)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Who determines progress and final payments in a construction contract?

A

Architect

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

If delivery terms are “FOB freight prepaid,” who pays shipping?

A

Seller

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

If a contractor license expires December 31 and is not renewed, how long is it legally valid?

A

60 days

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Ambient temperature refers to what?

A

The surrounding external medium

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Recommended repair for gas pipe dent impacting girth weld or seam?

A

Install full encirclement steel sleeve (open ends)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Pressure relief device outlets must discharge where?

A

Into the atmosphere without restriction

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Design pressure for steel gas piping is determined by what?

A
  • Temperature derating factor
  • Specified minimum yield strength
  • Nominal outside diameter
    (Answer often: “All of these”)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Helium-neon lasers are used to maintain what during sewer installation?

A

Horizontal and vertical alignment

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Sanitary sewer acceptance testing may include what?

A

Line and grade verification
Soil density confirmation
Visual inspection
(All may apply)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Minimum vertical clearance for support arms above driveways and parking lots?

A

15 feet

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Minimum grounding conductor size when no overcurrent protection is installed?

17
Q

Minimum conductor size for Grade N open-wire service drop over 750V, 180 ft span?

18
Q

Minimum diameter of a wire-core manila lifeline exposed to abrasion?

A

1 inch
(OSHA 1926.104(c))

19
Q

Employees may work without specialized anti-laser eye protection if reflected laser exposure is less than:

A

5 milliwatts
(OSHA 1926.54(c))

20
Q

Masonry walls must be braced or supported once height exceeds:

A

8 feet
(OSHA 1926.706(b))

21
Q

Lifting inserts in precast concrete (excluding tilt-up) must support at least:

A

4 times the maximum intended load
(OSHA 1926.704(c))

22
Q

For galvanic protection, anodes must be placed at least how far below tank bottom?

A

6 inches
(PEI RP200)

23
Q

Who determines if and when continuity testing of fuel dispensing equipment is performed?

A

Owner of dispensing equipment
(PEI RP400)

24
Q

Before assembling tapered thread (NPT) fittings, what must be verified?

A

Sealant is listed and compatible
(PEI RP400)

25
Who primarily establishes industry procedures for service station equipment and operations?
Petroleum Equipment Institute (PEI)
26
Maximum bottom slope in areas less than 5 ft deep?
1 ft vertical per 10 ft horizontal (.2516(c))
27
A public swimming pool circulation system must filter entire pool volume at least how many times in 24 hours?
4 times (.2518(b))
28
If the Department does not approve, disapprove, or comment on pool plans within 30 days, the plans are:
Deemed approved
29
An operation permit for a public swimming pool is valid for:
Up to 12 months
30
Who is responsible for inspecting the watershed of an unfiltered public water system?
Person or company supplying the water
31
Water entering the distribution system must maintain a chlorine residual of at least:
0.20 mg/L
32
If a question lists multiple mechanical or code factors that all affect design pressure, the likely correct answer is:
“All of these”
33
If a question asks who has authority in a contract for progress/final payments:
Architect