During go around. Excessive angle of bank is called when
“BANK” at 7 degrees
During go around the attitude is too high
“PITCH” +20degrees
During go around the attitude is too low
“PITCH” 10degrees or less
During go around the climb rate is insufficient
“SINK RATE” no climb rate
RNP-AR
Support calls vertical and lateral
sink rate and bank
& When to Go Around
and when do they apply?
PM Calls out excessive deviation
L/DEV reaches 1/2 dot (LAT DEV)
(scale is in 0.1nm, max scale 0.2nm)
V/DEV reaches 1/2 dot (V/DEV)
(vertical scale 1 dot=100’)
“sink rate” v/s above 1000’/min
“Bank” when bank angle>30deg
Go around must be initiated
XTK reaches 1RNP
V/DEV reaches 3/4 dot below profile
Apply from
vertically from the FAF
laterally from below MSA/MVA
ILS approach support calls
LOC and GLIDE
called at 1/2 dot
NPA calls
“CROSS TRACK” when>0.1nm
“V/DEV” when > 1/2 dot
“COURSE” when> 1/2 dot or 2.5 deg VOR or 5deg ADF
2D approach lateral path tracking tolerance
within 5 degrees of track
within half scale if using lateral course deviation indicator guidance
within 1xRNP
3D approach LAT and VERT tolerance
within 5 degrees of track
within half scale if using lateral course deviation indicator guidance
within 1xRNP
vertical
within half scale or 75’ for RNP BARO VNAV