what 4 points define scope management
what are 6 main areas that work together to identify, define and control Scope Management
what are 5 benefits of a formal requirements analysis process
what are the 4 steps to the requirements process
what is documented in the functional specification
this captures all agreed user requirements in an unambiguous manner. it defines what is required but not how the requirement will be met
once a function is defined what 2 actions are required
2. the functional specification will specify appropriate quality parameters
what are the points that describe the Work Breakdown Structure (WBS)
what are 7 defining attributes of a work package/task
why is the size of WP important
they must be small enough to allow realistic estimates to be made, but not so small the volume overwhelms the planning and control process
what are 7 benefits of the WBS
what is the difference between the WBS and PBS
WBS is activity related, PBS is product related. it breaks the project down into its constituent products and sub-products
what are the 3 main objectives of the PBS
what are product characteristics within the PBS
what is the relationship between the WBS and PBS
WBS breaks down the work into individual tasks and each task delivers a ‘product’
PBS breaks down the product into individual components and each component requires ‘work’
it is common to have hybrid solutions where a product is broken down into the work needed to produce it
what is a Cost Breakdown Structure CBS
CBS shows all the different cost categories that make up the total project costs
the costs are applied to every WP/task on the WBS or end items on the PBS enabling costs to be rolled up to any required level
what is a Organisational Breakdown Structure OBS
OBS shows how the project team is organised
it shows the reporting relationships and communication channels
it can be developed to show how the project team communicates with and reports to the owning organisation
what is a Responsibility Assignment Matrix
the WBS and OBS can be combined to produce a matrix which shows the personnel required to execute each WP/task
what are the 5 definitions within a RASCI chart
Responsible Accountable/Authorise Support Consult Inform
what are 5 examples of cost categories within and CBS
what is the definition of the Scope Baseline
The reference levels against which a project, programme or portfolio is monitored or controlled
what is the scope baseline used for