What is T.S. 3.3.1 Reactor Protective System (RPS) Instrumentation and its applicability?
3.3.1 Reactor Protective System (RPS) Instrumentation
Four RPS trip units, associated instrument channels, and associated Zero Power Mode (ZPM) Bypass removal channels for each of the following.
1) VHPT
* Modes 1, 2, 3, 4 & 5
2) High Startup Rate
3) Low Primary Coolant System Flow Trip
4/5) Low SG Level Trip (A & B)
6/7) Low SG Pressure Trip (A &B)
8) High Pressurizer Pressure Trip
* Modes 1 & 2 and 3, 4, 5 with more than one full-length control rod capable of being withdrawn and PCS boron concentration less than REFUELING BORON CONCENTRATION
9) Thermal Margin/Low Pressure Trip
10) Loss of Load Trip
11) Containment High Pressure Trip
* Modes 1 & 2 and 3, 4, 5 with more than one full-length control rod capable of being withdrawn and PCS boron concentration less than REFUELING BORON CONCENTRATION
12) Zero Power Mode Bypass
* Modes 1 & 2 and 3, 4, 5 with more than one full-length control rod capable of being withdrawn and PCS boron concentration less than REFUELING BORON CONCENTRATION
Per T.S. 3.3.1 Reactor Protection System, what must be done if a Zero Power Mode Bypass function is inoperable?
T.S. 3.3.1 ZPM Bypass Inoperable
Immediately either remove the affected ZPM Bypasses. or declare affected trip
units inoperable.
According to T.S. 3.3.1 Reactor Protection System, what must be done if one or more Functions with two RPS trip units or associated instrument channels inoperable?
One or more Functions with two RPS trip units or associated instrument channels inoperable.
Within 1 hour, place one trip unit in trip.
At what Control Room air temperature does T.S. 3.3.1 Reactor Protection System require a shutdown?
Control room ambient air temperature > 90F.
Be in Mode 3 in 6 Hours
And verify no more than one full-length control rod is capable of being withdrawn or PCS boron concentration is at REFUELING BORON CONCENTRATION.
What is T.S. 3.3.2 Reactor Protective System (RPS) Logic and Trip Initiation and its applicability?
3.3.2 Reactor Protective System (RPS) Logic and Trip Initiation
Six channels of RPS Matrix Logic, four channels of RPS Trip Initiation Logic, and two channels of RPS Manual Trip shall be OPERABLE.
MODES 1 and 2,
MODES 3, 4, and 5, with more than one full-length control rod capable of
being withdrawn and Primary Coolant System (PCS) boron concentration less than REFUELING BORON CONCENTRATION.
What do you do if one channel of Trip Initiation Logic is inoperable for T.S. 3.3.2 Reactor Protective System (RPS) Logic and Trip Initiation?
3.3.2 Reactor Protective System (RPS) Logic and Trip Initiation
If one channel of Trip Initiation Logic inoperable, then within 1 hour de-energize the affected clutch power supplies.
What do you do if two channels of Trip Initiation Logic is inoperable for T.S. 3.3.2 Reactor Protective System (RPS) Logic and Trip Initiation?
3.3.2 Reactor Protective System (RPS) Logic and Trip Initiation
If two channels of Trip Initiation Logic affecting the same trip leg inoperable, then IMMEDIATELY de-energize the affected clutch power supplies.
What is T.S. 3.3.3 Engineered Safety Features (ESF) Instrumentation and its applicability?
3.3.3 Engineered Safety Features (ESF) Instrumentation
Four ESF bistables and associated instrument channels for each Function as follows shall be OPERABLE.
1) Safety Injection Signal (SIS)
2) Steam Generator Low Pressure Signal (SGLP)
* SG A & B Low Pressure in Mode 1 and Modes 2 and 3 if MSIV not closed and deactivated and MFRV and MFRV Bypass Valves are not closed and deactivated or isolated via manual valves.
3) Recirculation Actuation Signal (RAS)
* SIRWT Low Level in Modes 1, 2 and 3
4) Auxiliary Feedwater Actuation Signal (AFAS)
* SG A & B Low Level in Modes 1, 2 and 3
5) Containment High Pressure (CHP)
* CHP Left and Right in Modes 1, 2 and 3
6) Containment High Radiation Signal (CHR)
* CHR in Modes 1, 2, 3 and 4
7) Automatic Bypass Removals
What is an Engineered Safety Feature? What are the signals that actuate an ESF?
Engineered Safety Features are systems desinged to mitigate accidents.
1) Safety Injection Signal
2) Steam Generator Low Pressure Signal
3) Recirculation Actuation Signal
4) Auxiliary Feedwater Actuation Signal
5) Containment High Pressure Signal
6) Containment High Radiation Signal
7) Pressurizer and SG LP Signal Block Removal
How does SIAS/Low Pressurizer Pressure Block and Removal work?
SIAS Block and Removal
How does the SG LP Block and Removal function?
SG LP Block and Removal
3 out of 4 SG Pressure Switches indicate less than 550 psig, then that generator’s low pressure signal may be blocked.
2 out of 4 SG Pressure Switches indicate greater than 550 psig, that the low pressure signal block is removed for that generator.
What is T.S. 3.3.4 Engineered Safety Features (ESF) Logic and Manual Initiation?
Any 1 hour or less actions?
T.S. 3.3.4 Engineered Safety Features (ESF) Logic and Manual Initiation
Applicable
No 1-hour or less actions.
What is T.S. 3.3.5 Diesel Generator (DG) - Undervoltage Start (UV Start)?
Any 1-hour or less actions?
T.S. 3.3.5 Diesel Generator (DG) - Undervoltage Start (UV Start)
Applicable When associated DG is required to be OPERABLE.
Three channels of Loss of Voltage Function and three channels of Degraded Voltage Function auto-initiation instrumentation and associated logic channels for each DG shall be OPERABLE.
1-hour or less actions
Immediately declare affected DG inorperable when one or more Functions with one channel per DG inoperable.
What is T.S. 3.3.6 Refueling Containment High Radiation (CHR) Instrumentation?
Any 1-hour or less actions?
T.S. 3.3.6 Refueling Containment High Radiation (CHR) Instrumentation
Applicable During CORE ALTERATIONS, During movement of irradiated fuel assemblies within containment.
Two Refueling CHR Automatic Actuation Function channels and two CHR Manual Actuation Function channels shall be OPERABLE.
1-hour or less
One or more Functions with two channels inoperable, IMMEDIATELY suspend core alterations and movement of irradiated fuel assemblies in containment.
What is T.S. 3.3.7 Post Accident Monitoring (PAM) Instrumentation?
Any 1-hour or less actions?
T.S. 3.3.7 Post Accident Monitoring (PAM) Instrumentation
Applicable MODES 1, 2, and 3.