What is required to restart a RCP with any RCS cold leg temperature ≤ 350 ˚F?
RCS/SG ∆T < 50 ˚F

What are your ≤ 1 hr action(s) if ≥ 1 ECCS accumulators are not isolated while in MODES 4-5 or MODE 6 with the Rx Vessel Head on?


What are your ≤ 1 hr action(s) if 2 RHR trains are inoperable while in MODE 5 w/ RCS loops not filled?

Initiate action to return required RHR trains to OPERABLE status [Immediately]
Note:
2 RHR trains may be inoperable for testing for 2 hrs provided remaining RHR train is OPERABLE

What are your ≤ 1 hr action(s) if both PORV block valves are inoperable while in MODES 1-3?

OR
AND
OR
OR
AND

Why are only nuclides with greater than 15 minute half-lives considered in E-bar?
Difficult to identify short-lived radio-nuclides
Once FPP released during DBA, it takes 30 mins to get to site boundary
What are your ≤ 1 hr action(s) if all RCS/RHR loops are inoperable in MODE 4?
AND
Note:
All RCS/RHR loops may be secured for 1 hr provided:
When is LCO 3.4.8 Specific Activity Applicable?

MODES 1-5

When is LCO 3.4.1.1 RCS S/U and Power Operation Applicable?

MODES 1-2

Bases:
DNBR concerns
What are your ≤ 1 hr action(s) if 2 RHR trains are inoperable AND ≥ 3 SGs have a NR Level of < 10% while in MODE 5 w/ RCS loops filled?

OR

What are your ≤ 1 hr action(s) if any RCS heatup rate, cooldown rate, or hydrostatic rate of change is violated?

AND
OR
AND

When is LCO 3.4.4 PZR Relief Valves Applicable?

MODES 1-3

Manual operation is required for safety function.
When is LCO 3.4.5 S/G tube Integrity Applicable?

MODES 1-4

What are your ≤ 1 hr action(s) if one PZR safety valve is inoperable while in MODES 1-3?

Restore PZR Safety to OPERABLE [1 hr]
OR
Be in MODE 3 [6 hrs]
AND
Be in MODE 4 [Following 6 hrs]

What are your ≤ 1 hr action(s) if ≥ 1 PZR PORV is inoperable due to seat leakage in MODES 1-3?

OR
OR
AND

What are your ≤ 1 hr action(s) if all Rx Coolant loops are inoperable while in MODE 3?

AND
Note:
All RCS loops may be secured for 1 hr provided:

What RCS/RHR loops should be OPERABLE while in MODE 5 w/ RCS loops filled?
1 RHR train w/ 125 gpm flowrate
AND
1 additional RHR Train
OR
2 SGs with NR Level > 10%
2 RHR trains may be inoperable for testing for 2 hrs provided remaining RHR train is OPERABLE
All RHR loops may be secured for 1 hr provided:

When is LCO 3.4.9.1 RCS Pressure/Temperature Limits Applicable?

At All Times

What must be done if thermal power changes 15% within 1 hr?
Sample of I-131, I-133, I-135 within 2 hrs - 6 hrs

What are your ≤ 1 hr action(s) if only RCS/RHR 1 loop is OPERABLE while in MODE 4?

AND

What are your ≤ 1 hr action(s) if all RHR trains are inoperable while in MODE 5 w/ RCS loops not filled?

AND
Note:
All RHR loops may be secured for 1 hr provided:

What are your ≤ 1 hr action(s) if one PZR PORV block valve is inoperable in MODES 1-3?

OR
AND
OR
OR
AND

What are your ≤ 1 hr action(s) if > 1 CCP is capable of injecting into the RCS while in MODES 4-5 or MODE 6 with the Rx Vessel Head on?


What are your ≤ 1 hr action(s) if 1 PZR PORV is inoperable for reasons other than excessive seat leakage while in MODES 1-3?

OR
AND
OR
OR
AND

When is LCO 3.4.6.2 Operational Leakage Applicable?

MODES 1-4