The IC will need to develop a _________ ____________ plan that includes the appropriate priorities, objectives, command structures, and resource requirements.
rescue operational
p 163
Rescue operational plan:
* ________. The _______ of day will provide information on the occupancy load and location of people in the structure.
p 163
Rescue operational plan:
* ______________. Knowledge of the ____________ will yield information on hazards, occupant use, types, and number of businesses.
p 163
Rescue operational plan:
* _________ and _______ ( _____ sides ). Consider all _____ sides and the area involved.
p 163
Rescue operational plan:
* ___________. _________ control is a major safety factor to rescuer and victim alike.
p 163
Rescue operational plan:
* _______. Surface and underground ______ systems may be part of the collapse problem or impact it by vibration.
p 164
Rescue operational plan:
* __________ equipment. Collapsed structure rescue operations may require the use of ___________ search equipment such as electronic listening devices, fiber optic camera; and portable cutting, breaking, and breaching equipment.
p 164
Rescue operational plan:
* _______________ equipment. Large, mechanized _____________ equipment may be needed to remove debris so that rescue operations can be expedited.
p 164
Rescue operational plan:
* __________ materials. A large amount of _________ materials may be required for access to the victim and structural stabilization. Pre-incident planning of supply sources is important.
p 164
Rescue operational plan:
* __________ ______. The first 24 hours of rescue operations will yield the most survivors. The term “__________ ______” is used for US&R as the “__________ _______” is used for medical.
p 165
Normally, a _________ ________ with heavy capability may arrive at the scene of a collapse structure incident sometime after initial actions have been taken by volunteers or first responder resources. The _________ ________ Leader commands a specialized resource that should assume those priority tasks the team is trained and equipped to perform.
rescue team / Rescue Team Leader
p 165
Rescue operational plan:
A _________ ____________ survey should be made so that the Team Leader can develop an accurate strategic and tactical operational plan before taking action.
damage assessment
p 165
Initial size-up:
Anticipated activities to perform before beginning structural collapse operations:
* Identify buildings _____________, that is, by address, physical location, unique design, etc.
* General area ________ to identify separate buildings from many in a given area, which offer the highest potential for viable _________ opportunities.
* __________ assessment and __________ of any particular building before search and rescue operations.
* __________ and _________ marking of a particular building.
p 165
Initial size up:
At least two possibilities exist when emergency responders arrive:
1. ___________ may have already identified viable search or rescue opportunities for the IC.
2. There may be little or no _________________ information when the IC arrives.
p 166
Structural collapse USAR management and coordination-
Size up/ Operational planning:
Once the initial assessment is underway or completed, the IC must begin to identify the overall mission _____________.
objectives
p 166
At the inception of an incident, the IC must determine the immediate __________ requirements and/or _________ opportunities.
search / rescue
p 166
Determining search requirements and/or rescue opportunities:
p 166
Incident Commanders must ask themselves: Are the ___________ committed achieving their _____________? If not, the corrective actions and revision to the __________ _________ _______ are needed.
resources / objectives / Incident Action Plan
p 167
Incident management:
Teams must be ____________ to ensure that they function in a cohesive and effective manner. Monitoring must be done to ensure that ____________ performance is adequate.
monitored / individual
p 167
Incident management:
The IC, operating at the Command Post, acts as a hub for ______________ from the members, operating in the incident area.
information
p 167
Incident management:
A communication radio channel for _________, _________, and ___________ operations is important.
tactical, command, and logistics
p 167
Incident management:
The assignment of incident personnel is based upon the ___________ ____________ plan and priorities for ________ and ________ tasks.
developed operational / search and rescue
p 167
Incident management:
The Incident Action Plan is based upon known or anticipated _________ and _________ requirements.
search and rescue
p 167
Incident management:
A structural collapse ________ ___________ report should be filled out for each work. Each report should include the following:
* Personnel assigned to that ___________
* __________ made or ___________ undertaken
* Potential __________ sites
* __________ considerations
* __________ of the site
USAR operations
p 167