CTS details for HP side door dispatch on SC8/GQ6?
CTS details for HP ramp dispatch?
CTS details for SEAC Pack ramp dispatch?
CTS details for Jungle Line side door dispatch?
CTS details for Jungle Line ramp dispatch?
CTS details for Steel Barrel ramp dispatch?
CTS details for Ski Pack (Canadian Tube) dispatch?
CTS details for Large Oversill Load (LOSL) dispatch?
CTS limitations for maximum size and mass for Light Stores despatch from PTD?
What additional procedure must be followed for simultaneous despatch of Jungle Lines from the PTDs?
A 2 second delay is mandated between the left and right PTD.
Where must despatch crew members stationed on the forward position of the PTD attach their harness?
To a TDP level or forward of FR51.
Where must parachutes attached to TDPs be weak linked?
At the parachute apex (unmodified).
Where must Jungle Line static lines be attached?
To a TDP.
Which is the only role Large Light Stores (LOSL/Ski Pack) can be despatched using??
Role 1 due to being the only one with an end stop placed at the end of the Inboard Starboard Cable to initiate a modified parachute static line.
State the Light Stores Hang Up Drill?
“LOAD EMERGENCY HANG UP PORT/STBD/RAMP” - ALM
Evaluate then state whether the Hang Up is endangering the aircraft - ALM
If hang up is endangering the aircraft;
PF - “CUT FREE THE HANG UP”
ALM - Cut free and call “LOAD GONE”
PM - Mark Position at Load Gone
If hang up is stable and NOT endangering the aircraft
RED LIGHT - ON
If hang up is from PTD:
PM - Yaw trim apply 50% toward the hang up side
Avoid habitation, Gentle turns toward the hang up side, maintain drop speed, enter the Race Track, Push HUD Tac PB, Re-program the original CARP, Re-fly the CARP, at drop height.
At GREEN LIGHT - “GREEN ON, CUT FREE”
PM - Press Yaw Trim Reset
“Hang Up Drill - Complete”
After Drop Checklist - Action
What are the details for the SC8 parachute?
What are the details for the GQ6 parachute?
What are the details for the 28 ft Utility parachute?
What are the details for the SC15 parachute?
What are the details for the SC21 parachute?
How many EDM layers for a Light storeys an SC8:
2. 2 Layers
How many EDM layers for a Light store on a 28ft:
2. 2 Layers
How many EDM layers for a Light store on 2 x 28ft:
2. 3 Layers
CTS details for HP side door dispatch on 28ft?
25 x 15 x 45
5
250ft