Generally speaking, how long does it take to do the Product Quality Audit?
• One and ½ days
What are the most common defects noted in the Product Quality Audit?
* Holes in mats and linen
What can you, as a Plant Manager, do to improve quality in your location?
What gets poly wrapped?
How are pin repairs handled?
How are “pressed” accounts handled?
• Press garments are separated by the SSR on the truck, unload gives them to the wash alley operator to wash in the pony washer. Press is given to the press operator to be pressed and blended into the route.
How are late pieces injected?
What defect percentage standards should you be achieving at your location, and what is your defect rate?
What are your locations standards for Shakeout, Sorts, Wrapout, Press, Bulk, and Mats?
• Shakeout- incentive shirts= 245 - incentive file
• Pants= 250 - incentive file
• Sorts= 1st/3rd- 1800, 2nd – 1600, audit- 900 (scanning) Labor audit
• Bulk-incentive= rate varies by product
• Mats-125/hour
- press 90/hour
What are you doing to improve your locations standards without sacrificing quality?
Discuss the set up and purpose of the Labor Audit (POS). What is needed to do so and what is the importance of the labor audit?
Explain in depth what each criteria for Plant Manager PEAK is and what they can do to get better.
Look at peak