(a) From TR 1 via DC bus 1 and DC Bat Bus
(b) From ESS TR.
(c) From TR 2.
(d) From Batt 2.
(a) From TR 1 via DC bus 1 and DC Bat Bus
(a) The Rat is automatically extended and powers the yellow system which drives the emergency generator.
(b) The Rat is automatically extended and powers the blue system which drives the emergency generator.
(c) The Rat has to be manually extended.
(d) The Rat is extended and mechanically connected to the emergency generator.
(b) The Rat is automatically extended and powers the blue system which drives the emergency generator.
(a) A three phase 115/200 volt 400 hertz constant frequency AC system and a 28 DC system
(b) A three phase 180/220 volt 400 hertz constant frequency system and a 28 volt DC system
(c) A three phase 115/220 volt 400 hertz constant frequency system and a 28 volt DC system
(d) A three phase 115/200 volt 400 hertz constant frequency DC system and a 28 volt AC system
(a) A three phase 115/200 volt 400 hertz constant frequency AC system and a 28 DC system
(a) DC Bus 1 or batteries.
(b) DC Bus 1, DC Bus 2 or batteries.
(c) DC Bus 2 or batteries.
(d) DC Bus 1 only.
(b) DC Bus 1, DC Bus 2 or batteries.
(a) To be connected in parallel.
(b) To be supplied by any generator or external power.
(c) To be supplied by apu gen or external power only
(d) To be tied to external dc power.
(b) To be supplied by any generator or external power.
(a) The ram air turbine is extended.
(b) The blue system is pressurised and the emergency generator comes on line.
(c) The green system is pressurised and the emergency generator comes on line, supplied by hot bus 2.
(d) The emergency generator comes on line and the yellow system is pressurised.
(b) The blue system is pressurised and the emergency generator comes on line.
(a) 22v.
(b) 25.5v.
(c) 27.5v.
(d) No Minimum.
(b) 25.5v.
(a) For no more than 3 secs.
(b) For longer than 3 secs.
(c) Until the fault light goes out.
(d) For no more than 5secs.
(a) For no more than 3 secs.
(a) Rat is not extended.
(b) Emergency generator is not supplying when AC bus 1 and 2 are not powered or Dc Bat bus is not powered.
(c) Emergency generator is supplying but AC Ess bus is not powered.
(d) Emergency generator is not supplying when AC Bus 1 and 2 are not powered.
(d) Emergency generator is not supplying when AC Bus 1 and 2 are not powered
(a) AC Bus one and 2 are not powered and emergency generator is automatically connected.
(b) AC Bus 1 is powered by the gen. 2 because the gen 1 is deactivated.
(c) AC Bus 1 is powered by the gen.2 because the gen.1 line contactor is opened.
(d) AC Bus 1 is not powered because the gen. 1 line contactor is opened and transfer contactor is not closed.
(c) AC Bus 1 is powered by the gen.2 because the gen.1 line contactor is opened.
11 (DSC-24-20/30) Where can the battery voltage be checked;
(a) On the ECAM elec page only
(b) On the elec overhead panel and the ECAM elec page
(c) On the elec overhead panel and the ECAM E/WD
(d) On the elec overhead panel only
(b) On the elec overhead panel and the ECAM elec page
(a) AC Bus 1.
(b) AC Bus 2.
(c) Static inverter.
(d) Emer. gen.
(a) AC Bus 1.
(a) Yes.
(b) No.
(c) Only A/C Ess Shed Bus is lost.
(d) Only D/C Ess Shed Bus is lost.
(a) Yes.
(a) Always.
(b) When A/C speed is > 50kts and on batteries only.
(c) When one main generator fails.
(d) Only when gen. 2 fails.
(b) When A/C speed is > 50kts and on batteries only.
(a) The Rat is extended.
(b) The emergency generator is activated.
(c) Nothing.
(d) The blue hydraulic system is pressurised and this causes the RAT to extend and rotate.
(a) The Rat is extended.
(a) Single phase 115v - 400 Hz. A/C current.
(b) Three phase 115/200v - 400hz. A/C current.
(c) 28v D/C current.
(d) 25.5v D/C current.
(a) Single phase 115v - 400 Hz. A/C current.
(a) A/C Ess bus and Engine Ignition A
(b) Eng Ignition & A/C Ess Bus & A/C Ess Shed Bus
(c) Eng Ignition Only.
(d) Hot bus 1.
(a) A/C Ess bus and Engine Ignition A
(a) Yes.
(b) No.
(c) Only in flight.
(d) No, Apu. gen. has priority over external power always.
(a) Yes.
(a) Yes
(a) The Apu.
(b) The other computer.
(c) Bus tie takes place and the remaining main generator supplies both channels.
(d) The RAT.
(a) The Apu.
(a) The other TR automatically replaces the faulty one & the Ess TR supplies the DC Ess Bus.
(b) The Static inverter replaces the faulty TR.
(c) The DC Bus on the faulty side is lost.
(d) The Emergency generator supplies DC power on the faulty side.
(a) The other TR automatically replaces the faulty one & the Ess TR supplies the DC Ess Bus.
(a) Hot bus 2.
(b) Ess TR.
(c) Both.
(d) Hot Bus 1.
(a) Hot bus 2.
(a) Hot bus.
(b) Ess TR.
(c) Both.
(d) DC Bat bus.
(b) Ess TR.
(a) Speed.
(b) Voltage.
(c) Frequency.
(d) GLC (generator line contactor)
(a) Speed.