In schematic design, what is the client NOT responsible for providing?*
A) Construction budget
B) Construction methods
C) Geotechnical report
D) Legal survey
B) Construction methods
What is the Schematic Design phase of the project?
When the client’s requirements & desires assume architectural form.
What information do you need to start SD? (7)
What does the client provide? (5) why?
So not all the liability rest on the archiect
What 3 aspects of the project are illustrated during SD?
Who’s in the core design team?
What are the presentation documents provided at the END of SD?
as appropriate:
Prepare a schematic design report incorporating, as appropriate:
What is typically provided by consultants in the SD report? (2)
~ SME systems approach
~ probable construction/operating costs
Explain the scope of the analysis of the building code at SD Phase
1 - Environmental impact, Zoning, Parking Requirements and Limiting Distance. (General Overview rather than a detail analysis)
2 - Occupancy/Classification
3 - Occupancy/Compartment fire Separations
4 - Area & Occupant Load
5 - Exiting & Egress (Travel Distance and Widths for large Buildings)
6 - BF Requirements
7 - Washroom Count
Explain the principles of sustainable design as they relate to the Building (size, footprint, mass, form, and circulation) during schematic design. (11)
How can the Architect foster sustainable design during schematic design.
Explain the scope of the analysis of the universal accessibility at the schematic design phase.
What do you need to proceed to DD?
Submit the schematic design documents to the Client and obtain the Client’s approval prior to proceeding to the Design Development Phase.