The Contract Documents are between what parties? A201
between the Owner and Contractor
The Contract Documents consist of: A201
A Modification is ? A201
(1) a written amendment to the Contract signed by both parties,
(2) a Change Order
(3) a Construction Change Directive
(4) a written order for a minor change in the Work issued by the Architect.
How can the contract be amended? A201
Only by a modification
The Contract Documents creates a contractual relationship between? A201
The Owner and the Contractor
The Contract Documents does not create a contractual relationship between? A201
1) between the Contractor and the Architect or the Architect’s consultants, (2) between the Owner and a Subcontractor or a Sub-subcontractor, (3) between the Owner and the Architect or the Architect’s consultants or
(4) between any persons or entities other than the Owner and the Contractor
The Work: A201
The term “Work” means the construction and services required by the Contract Documents, and includes all other labor, materials, equipment and services provided or to be provided by the Contractor.
The Project A201
The Project is the total construction of which the Work performed under the Contract Documents may be the whole or a part and which may include construction by the Owner and by separate contractors.
The Drawings A201
The Drawings are the graphic and pictorial portions of the Contract Documents showing the design, location and dimensions of the Work, generally including plans, elevations, sections, details, schedules and diagrams.
The Specifications A201
The Specifications are that portion of the Contract Documents consisting of the written requirements for materials, equipment, systems, standards and workmanship for the Work, and performance of related services
Instruments of Service A201
Are representations of creative work performed by the Architect and the Architect’s consultants. Instruments of Service may include, without limitation, studies, surveys, models, sketches, drawings, specifications, and other similar materials.
Who has ownership of Drawings, Specs, and other Instruments of Service A201
The Architect and the Architect’s consultants shall be deemed the authors and owners of their respective Instruments of Service
Contractor and Subcontractors relationship to Drawings, Specs & Instruments of Service
When can a contractor request the owner provide evidence that they can financially fulfill their obligations. A201
Prior to commencement of the Work, the Contractor may request in writing that the Owner provide reasonable evidence that the Owner has made financial arrangements to fulfill the Owner’s obligations under the Contract. Thereafter, the Contractor may only request such evidence if
(1) the Owner fails to make payments to the Contractor as the Contract Documents require;
(2) a change in the Work materially changes the Contract Sum; or (3) the Contractor identifies in writing a reasonable concern regarding the Owner’s ability to make payment when due.
Owners Right to Stop the Work A201
2. repeatedly fails to carry out Work in accordance with the Contract Documents
Owner’s Right To Carry Out The Work A201
If the Contractor defaults or neglects to carry out the Work in accordance with the Contract Documents and fails within a ten-day period after receipt of written notice from the Owner to commence and continue correction of such default or neglect with diligence and promptness, the Owner may correct such deficiencies.
What does a contractor do when they discover errors in the contract documents? A201
the Contractor shall promptly report to the Architect any errors, inconsistencies or omissions discovered by or made known to the Contractor as a request for information in such form as the Architect may require
Contractors responsibility in relation to local codes etc.
A201
The Contractor is not required to ascertain that the Contract Documents are in accordance with applicable laws, statutes, ordinances, codes, rules and regulations, or lawful orders of public authorities but the Contractor shall promptly report to the Architect any nonconformity discovered by or made known to the Contractor as a request for information in such form as the Architect may require.
Supervision and Construction Procedures A201
The Contractor shall be solely responsible for, and have control over, construction means, methods, techniques, sequences and procedures and for coordinating all portions of the Work under the Contract
When can a Contractor make substitutions? A201
The Contractor may make substitutions only with the consent of the Owner, after evaluation by the Architect and in accordance with a Change Order or Construction Change Directive.
The Contractor warranties that: A201
What happens if the Contractor encounters conditions at the site that are either subsurface or concealed or unusual or unknown physical conditions? A201
What happens if a body, burial site, archeological site or wetlands are found on site? A201
Superintendant A201