What is the RIBA Plan of Works?
A plan organising the process of briefing, designing, constructing, maintaining, operating and using building projects into a number of key stages.
Can you list the RIBA stages?
0 - Strategic definition 1 - Preparation and briefing 2 - Concept design 3 - Spatial coordination 4 - Technical design 5 - Manufacturing and construction 6 - Handover 7 – Use
How many stages are there?
8 Stages
What are the benefits of using timber frame construction?
What are the disadvantages of using timber frame construction?
What are the benefits of using concrete frame construction?
What are the disadvantages of concrete frame construction?
What are the benefits of steel frame construction?
What are disadvantages of steel frame construction?
What is value engineering?
Maximising value, through eliminating unwanted costs whilst improving functionality.
What is Value Management?
Achieving value for Money, through identifying what is most important and ensuring that function is achieved.
What are British Standards?
Standards for the quality of goods and services within Britain.
What is oversailing?
Where say a crane has to pass over another person’s land, this will require a license.
What types of flat roof are there?
* Cold.
What are the different types of coverings for a flat roof?
What is cold bridging?
An area where condensation can form due to it being significantly colder than the rest of a building.
Why does cold bridging matter?
Designing out areas where cold bridging can occur, i.e. junctions between walls, roofs and floors will help the sustainable performance of a building.
What does O&M Manual Stand For?
Operation and Maintenance Manual.
What is the O&M Manual?
What might be included within the Operation and Maintenance manual?
What is the Health and Safety file?
A file prepared as part of the Construction (Design and Management) Regulations, by the Principal Design.
• It should identify the risks that could not be eliminated through design, whilst also including information provided by the Principal Contractor.
• The file should be regularly updated when changes to the building are made.
What should be included within the Health and Safety file?
What are the Health and Safety Issues with Piling?
What types of piles do you know of?