ELEC_001
Location and function of the ground service switch:
MD-88:
MD-90:
ELEC_002
Recall the essential electrical equipment that may be powered during a complete loss of normal electrical power when positioning EMER PWR switch to ON or ARM (90):
ELEC_003
Recall when the battery charger will operate?
ELEC_004
Understand that on initial electrical power up (MD-90), you must wait 90 seconds before starting APU. Why?
This will allow EPCU built-in-test to finish and prevents an ELEC SYS BIT FAIL message on the OAP. (Requires maintenance action to clear)
ELEC_005
Explain how to connect the APU generator to electrical system:
ELEC_006
Explain the meaning of each blue light on the electrical panel:
MD-88:
MD-90
ELEC_007
Know where to read voltage, frequency and amps:
AC VOLTS Meter, FREQUENCY Meter, and AC LOAD Meter are located on Electrical Power Panel of Forward Overhead Panel. DC Volts, Amps and Loads are adjacent to AC indicators.
ELEC_008
List the components powered by the ground service bus:
Ground service bus provides power to only those circuits necessary for ground servicing.
ELEC_009
Recall how long the batteries will last on emergency power:
MD-88:
ELEC_010
(88) Recall the function of the A/C BUS X TIE Switch:
The AC Crosstie system has 3 functions:
NOTE: Under certain fault conditions, AC crosstie relay will lock open.
ELEC_011
(90) Recall the function of the BUS TIE switches on MD-90:
ELEC_012
Recall the function of the DC BUS X TIE Switch:
ELEC_013
Recall the function of the EMER PWR switch:
MD-88
MD-90
ELEC_014
Explain the function of the BATT switch:
ELEC_016
Recall normal AC power voltage and frequency for the engine driven generators: